The EU 2017/79 certification process follows a structured, multi-stage workflow designed to verify that eCall systems meet strict safety and performance standards. With the transition to NG eCall, planning and timing have become more important than ever.

A typical project includes four main phases:

1.Preparation and legal setupManufacturers appoint an EU Authorized Representative and select a qualified notified body. This phase takes 1–2 months.

2.Design, documentation, and pre-testingTechnical files, risk assessments, and software specifications are prepared. Pre-testing helps catch issues early.

3.Formal laboratory and road testingTesting covers environmental reliability, EMC, positioning, and emergency call performance. NG eCall requires real-network road testing. This phase typically lasts 2–4 months.

4.Document review and certificationThe notified body reviews all reports and issues the official certificate upon approval.

In ideal conditions, a well-prepared NG eCall project can be certified in 8–12 weeks. For most manufacturers, a realistic timeline is 4–6 months from start to finish.

Delays most often come from testing failures, document gaps, or long lab waiting times. Starting early and designing for compliance from the beginning is the best way to stay on schedule.